Mike Flagg, Manager, Application Engineering
Doug Krebs, Flux-Cored Consumables Product Manager
The Lincoln Electric Company
In the wake of the 1994 Northridge earthquake in the Los Angeles area, the
Federal Emergency Management Agency issued FEMA 353, a document that details
quality assurance guidelines for construction of steel moment-frame buildings
in seismic applications. Because these are guidelines and not
a code, the Engineer of Record, building owner or municipality specifies which
parts, if any, of the FEMA recommendations should be used on a particular construction
job.
Since specifications can change from project to project, it is important for
contractors and welding engineers to have a good understanding of what FEMA
353 entails. For example, electrodes meeting FEMA 353 recommendations may be
more expensive than standard electrodes. In addition, special qualification
of welders may be recommended. If the contractor does not take this into account,
project costs may be underestimated. Also, these consumables may not be as readily
available, resulting in possible project delays if not accounted for during
the planning phases.
FEMA guidelines are commonly used in regions subject to seismic activity, including
the U.S. West Coast, Boston, Memphis, St. Louis, Charlotte, Salt Lake City and
Phoenix.
This article will examine FEMA 353 welding recommendations related to flux-cored
self-shielded (FCAW-S) electrodes, typically the consumable of choice for building
erection in seismic areas. For example, for on-site construction, flux-cored
self-shielded electrodes can be used in winds of up to 30 mph without affecting
the weld quality or degrading the mechanical properties. In comparison, gas-shielded
electrodes, typically used in the fabrication shop, can have problems in winds
as low as 3 mph.
We will also discuss how the FEMA guidelines for electrodes differ from AWS
A5 requirements; what to look for when purchasing electrodes; and finally, what
actions the erector or fabricator must take to comply with these guidelines
before welding.
Please note that FEMA 353 includes design, inspection, quality control, quality
assurance, joint details, and other fabrication/erection issues that are beyond
the scope of this article. Readers are encouraged to review the entire FEMA
353 document for these and other guidelines. (This document, Recommended Specifications
and Quality Assurance Guidelines for Steel Moment-Frame Construction for Seismic
Applications, FEMA 353, July 2000, may be ordered by calling FEMA at 1.800.480.2520)
Comparing FEMA 353 to AWS A5 Test Requirements
AWS A5 filler metal classification test requirements for electrodes are not
always the best indicators of how the consumable will perform in actual field
conditions. FEMA 353, with significant focus on performance in the field, is
more stringent and calls out testing parameters that more closely simulate actual
welding conditions seen on a job site. FEMA 353 guidelines strive to ensure
a high level of quality for these applications.
So where do FEMA 353 and the AWS A5 requirements differ? Here are the four
primary areas:
- Welding Procedure Specification Toughness Verification Test
The AWS test plate is completed at one heat input which is specified as any
heat input within the range in which the electrode will be used. In contrast,
FEMA dictates two test plates at different heat inputs – a high heat
input at high interpass temperature and a low heat input at low interpass
temperature. During production fabrication, FEMA 353 recommends that the welder
use a procedure in between those two, which provides better control of the
resulting weld metal properties.
- Filler Metal Trade Name and Electrode Diameter
FEMA 353 requires that the consumable be qualified per trade name and manufacturer
as well as electrode diameter. Why? Even though electrodes may be in the same
AWS classification, their arc behavior can be significantly different. FEMA
353 also requires manufacturing lot control and testing, which provides a
higher level of confidence.
- Diffusible Hydrogen Requirement
AWS specifications allow weld metal diffusible hydrogen tests to be run on
a broad range of procedures, while FEMA 353 requires the test to be run in
the top 75 percent of the procedure range. This additional stipulation typically
increases the measured diffusible hydrogen level.
- Extended Exposure Test
Under AWS specifications, diffusible hydrogen testing may be conducted immediately
after the electrode is manufactured. However, in actual service, welding consumables
are not used right after manufacturing. Again, FEMA 353 recommendations take
a different approach. Here, for spooled or coiled electrode types exposed
on the job longer than one day, electrodes of that type must be exposed in
a humidity chamber to test diffusible hydrogen levels. In this way, FEMA electrode
exposure limits provide a more accurate picture of actual hydrogen levels
that will be achieved in the field.
To end our discussion in this category, it should be noted that in the future
AWS is expected to issue D1.8 – a Seismic Welding Code that will, in all
likelihood, incorporate the recommendations of FEMA 353.
What to Look for When Purchasing Electrodes
Below are some of the recommendations in FEMA 353 that can be used to aid contractor-buying
decisions regarding welding filler metal. The manufacturer will perform most
of the testing recommended under these guidelines. The contractor or erector
should make sure these tests have been completed and that the electrodes meet
the guidelines set forth by FEMA.
- Filler Metal Trade Name and Electrode Diameter
As was mentioned previously, when procedures are qualified, they must be qualified
according to the electrode manufacturer’s trade name and specific wire
diameter. When purchasing material, the contractor must purchase the same
tradename, manufacturer and diameter electrode that was qualified.
- Weld Strength Recommendations
It is recommended that all welds be made with E70 type filler metals (nominal
70 ksi tensile strength). However, if A913 Grade 65 is used, an E80 type filler
metal shall be used for matching strength.
- Charpy V-Notch Toughness Recommendations
FEMA 353 recommends that filler metals be tested at two temperatures. Charpy
V-Notch (CVN) toughness levels should meet the following minimum recommendations:
1) 20 ft. lbf avg. at 0º F (using the AWS A5 filler metal classification
test)
2) 40 ft. lbf avg. at 70º F (using the FEMA 353 Appendix A test)
- Welding Procedure Specification Toughness Verification Test
(FEMA 353 Appendix A Test)
The contractor, or a third party such as the electrode manufacturer, are to
run a Welding Procedure Specification (WPS) Toughness Verification Test to
determine the heat input range qualified for the electrode. The contractor
must use a WPS that falls within the range of heat inputs and interpass temperatures
tested. The toughness verification test results must meet the following minimum
mechanical properties: 70 ksi tensile, 58 ksi yield, 22 percent elongation
and average CVN toughness of 40 ft. lbf at 70º F.
- Diffusible Hydrogen Requirement
FEMA 353 recommends that filler metals meet the H16 diffusible hydrogen levels,
as defined by the applicable AWS filler metal specification. Diffusible hydrogen
levels should be tested in accordance with AWS A4.3 and may be reported on
the manufacturer’s typical certificate of conformance. Ask manufacturers
for evidence of this disclosure on their typical certificates of conformance.
-
Packaging
FEMA 353 recommends that flux-cored arc welding electrodes (FCAW) be received
and stored in a sealed moisture-resistant package until ready for use. New
foil bags and other package types are used to meet these guidelines.
- Extended Exposure Test
The exposure time for an electrode may be extended if it passes an extended
exposure test. Look for manufacturers that have performed this test when purchasing
electrodes.
What Actions Should the Erector or Fabricator Take to Comply?
We’ve discussed what to look for when purchasing flux-cored self-shielded
electrodes. Now, the discussion turns to the action steps the contractor or
erector must do to comply with FEMA 353 guidelines.
- Seismic Weld Categories
Contractors must be aware of the seismic weld categories into which each weld
falls as well as the ramifications for welding and quality assurance on those
joints in accordance with FEMA 353. The guidelines recommend each weld be
classified and listed on the shop and erection drawings. For example, each
weld should list a Seismic Weld Demand Category and a Seismic Weld Consequence
category – this will dictate the weld property recommendations, the
level of inspection and other fabrication issues. (See FEMA document Recommended
Specifications and Quality Assurance Guidelines for Steel Moment-Frame Construction
for Seismic Applications, FEMA 353, July 2000, Part II Tables 5-1, 5-2, 5-3
and 5-4. This document may be ordered by calling FEMA at 1.800.480.2520)
- Supplemental Welder Qualification Testing
FEMA 353 recommends that welders pass a “Supplemental Welder Qualification
Test” within the 12 months prior to starting on the project. Basically,
for each process that the welder is going to use on the job, the ability to
make a sound weld must be proved. (See photo of test mock-up)
- Intermixing FCAW-S Test
When flux-cored self-shielded (FCAW-S) arc welding is used with another welding
process, a test is recommended to confirm the CVN toughness of the intermixed
zone to meet 40 ft. lbf. at 70º F. For contractors, intermixing situations
could include tack welds or welds made in the shop with gas-shielded flux-cored
and then erected on site using self-shielded over those welds.
- Electrode Exposure – Time Limits
Electrode exposure time is restricted to minimize the risk of hydrogen cracking.
If welding stops for more than eight hours, unless extended exposure testing
has been performed, the electrode may not be used unless it has been removed
from the welding machine and stored in an oven. Contractors also have to dispose
of an electrode 24 hours after the package is opened or up to the manufacturers’
recommendations on exposure limits.
- Wind Velocity Limit
For all gas-shielded processes, contractors and welders are limited to 3-mph
winds in the vicinity of the arc. This guideline is intended to minimize the
loss of shielding gas that has a detrimental effect on the weld metal mechanical
properties.
- Maximum Preheat and Interpass Temperature
The maximum recommended preheat and interpass temperature is 550º F,
to avoid excessively slow cooling rates which may affect mechanical properties.
- Welded Joint Details
Tack welds attaching steel backing should be placed in the weld joint. After
welding has been completed, backing is removed, where indicated, and back-welded
with a 5/16-in. leg fillet, to minimize stress concentrations. (Refer to FEMA
353 for complete details. FEMA 353 may be ordered by calling FEMA at 1.800.480.2520)
 |
Conclusion
When purchasing electrodes for jobs specifying FEMA 353 guidelines, make sure
the manufacturer offers a product that has:
- Undergone extended exposure testing.
- Been subject to testing at both low and high heat inputs.
- Been sealed in robust, moisture resistant containers such as a foil bag
or a hermetically sealed pail.
In conclusion, it should be noted that not all manufacturers carry tested and
lot controlled material in stock. If your application is one in which you will
need immediate access to such consumables, find a manufacturer that can accommodate
your request.